HKIX Data Centre Air-Conditioning Enhancement Work
Date & Time: Dec 10, 2011, 09:00-09:45am HKT (GMT+8)
Scope of Work: To put a new Computer Room Air-Conditioning Unit (CRAC) into production
Potential Impact: For safety reasons, about 2/3 of the existing CRAC units need to be powered off; including the air-conditioning units at HKIX FTNS room during the period for connecting the new CRAC unit to the main circuit board. Although we will arrange other means for lowering the temperature of the Data Centre, however, HKIX participants’ or FTNS operators’ equipment might still encounter temperature alarm during the captioned period.
We are sorry for the inconvenience caused and appreciate your patience on this matter. |